外贸加工合同中英文 模板

公司是一家有资质的 公司,下面为大家整理了外贸加工合同的中英文 模板,供大家参考学习。

This Contract is made by and between the Buyers and the Sellers, whereby the Buyers agree to buy and the Sellers agree to sell the under mentioned commodity according to the terms and conditions stipulated below:

买方与卖方就以下条款达成协议:

1. COMMODITY:

Item No. Description

名称及规格 Unit

单位 Qty

数量 Unit Price (FOB Chongqing)

($)单价 Amount (FOB Chongqing)

($)总价

1 Mould of Plough VD0 and VD00 Sets 1 4847.36 4847.36

2 Mould of Furrower AE0 and AE1 Sets 1 2371.94 2371.94

Mould TOTAL VALUE:US $7219.3(Say U.S. Dollars Seven Thousand Two Hundred And Nineteen Point Three Only)

3 Plough VD0 Sets according to order 37.36 according to order

4 Plough VD00 Sets according to order 35.36 according to order

5 Furrower AE0 without SGC93 Sets according to order 6.90 according to order

6 SGC93 Sets according to order 3.67 according to order

7 Furrower AE1 Sets according to order 11.50 according to order

TOTAL VALUE:US $ according to order(Say U.S. Dollars according to order Only)

Other terms 1:

In the future, if the steel floating price will change no more than ±5%, the quotation is no change; if the steel floating price will change more than ±5%, the price be fixed by through negotiation by both sides. The table below list the steel price now.

附1:如果卖方国内市场钢材价格浮动小于或等于±5%,以上产品价格不作变动;如果钢材价格浮动大于±5%,由买卖双方协商价格变动幅度。以下列出所用主要钢材现行价格:

Q235 0.56 δ3 δ10

65MN 0.85 δ4 δ15

45# 0.74 δ5 φ14

δ2 0.64 δ6 φ22

Other terms 2:

In the future, if the current RMB price of the US dollar will change between 7.5~7.7, the quotation is no change; if the current RMB price of the US dollar will change exceed 7.5~7.7, the price be fixed by through negotiation by both sides.

附2:如果人民币与美圆汇率在7.5~7.7区间浮动,以上产品价格不作变动;如果汇率浮动超过此区间,由买卖双方协商价格变动幅度。

2. COUNTRY AND MANUFACTURERS:

原产国及制造商: China Chongqing Sanxia Machinery Factory 重庆市北碚三峡机械厂

3. PACKING:

VD0 and VD00: In steel shelf 钢架包装

AE0 and AE1:In cartons with Ribas’s brand. 带Ribas商标的纸板箱包装

4. SHIPPING MARK:

At Buyer’s Option 买方选定

5. TIME OF SHIPMENT(装运期):

Open moulds and deliver samples: within 80 days after receipt of T/T

开模具及送样:卖方收到外汇现金80天内送样

Formal order: After buyers confirm sample and then confirm order, within some days after receipt of T/T, to confirm times according to order.

正式定单:在买方确认样品及正式定单后,卖方收到外汇现金一定时间内装运,具体时间根据订单确定。

6. PORT OF SHIPMENT(装运港): Chongqing ,China

7. PORT OF DESTINATION(目的港):Barcelona , Spain

8. INSURANCE(保险):To be covered by buyers for 110% invoice value against All Risks.

9. PAYMENT(付款方式):

T/T 100%

外汇现金结算付款, 买方给卖方开出100%外汇现金T/T。

Sellers’s Bank information:

卖方银行资料:

10. SHIPMENT:

The Sellers shall ship the goods within the shipment time from the port of shipment to the destination. Transshipment is allowed. Partial shipment is not allowed.

运输:卖方应于交货期内将合同货物从装货港运到目的港,不许分批,允许转运。

11. SHIPPING ADVICE:

The sellers shall, immediately upon the completion of the loading of the goods, advise by fax the buyers of the Contract No., commodity, quantity, invoiced value, gross weight, name of vessel and date of delivery etc. In case due to the sellers not having faxed in time, all losses caused shall be borne by the sellers.

装运通知:卖方应于装货后,立即用传真将有关合同号、货物、数量、发票价值、毛重、运输工具名称、交货日期、货物预计抵达日等资料通知买方。如果由于卖方未能通知买方而造成的所有损失均由卖方承担。

12. GUARANTEE OF QUALITY:

The Sellers guarantee that the Commodity hereof is made of the best materials with first class workmanship, brand new and unused, and complies in all respects with the quality and specification stipulated in this Contract.

质量保证:卖方保证合同货物采用最好的材料、精湛的做工、全新、未使用过、质量和技术规格均符合合同的要求。

13. CLAIMS:

Damages occur in the course of operation by reason of inferior quality, bad workmanship or the use of inferior materials, the Buyers shall immediately notify the Sellers in writing and put forward a claim supported by Inspection Certificate issued by the State Administration for Entry-Exit Inspection and Quarantine of P.R.C. .The Certificate so issued shall be accepted as the base of a claim. The Sellers, in accordance with the Buyers/' claim shall be responsible for the immediate elimination of the defect(s), complete or partial replacement of the commodity or shall devaluate the commodity according to the state of defect(s), . If the Sellers fail to answer the Buyers within one month after receipt of the aforesaid claim, the claim shall be reckoned as having been accepted by the Sellers.

免责声明:我们致力于保护作者版权,注重分享,被刊用文章因无法核实真实出处,未能及时与作者取得联系,或有版权异议的,请联系管理员,我们会立即处理,本文部分文字与图片资源来自于网络,转载此文是出于传递更多信息之目的,若有来源标注错误或侵犯了您的合法权益,请立即通知我们,情况属实,我们会第一时间予以删除,并同时向您表示歉意,谢谢!

图片声明:本站部分配图来自人工智能系统AI生成,国外stocksnap摄影无版权图库。本站只作为美观性配图使用,无任何非法侵犯第三方意图,一切解释权归图片著作权方,本站不承担任何责任。如有恶意碰瓷者,必当奉陪到底严惩不贷!

内容声明:本文中引用的各种信息及资料(包括但不限于文字、数据、图表及超链接等)均来源于该信息及资料的相关主体(包括但不限于公司、媒体、协会等机构)的官方网站或公开发表的信息。部分内容参考包括:(百度百科,百度知道,头条百科,中国民法典,刑法,牛津词典,新华词典,汉语词典,国家院校,科普平台)等数据,内容仅供参考使用,不准确地方联系删除处理!本站为非盈利性质站点,本着为中国外贸事业出一份力,发布内容不收取任何费用也不接任何广告!